Honeywell MC-TDOY22 Digital Output Field Termination Assembly

SKU: MC-TDOY22
  • Manufacturer: Honeywell

  • Product No.: MC-TDOY22

  • Condition:In stock

  • Product Type: Digital Output Field Termination Assemblies

  • Product Origin: USA

  • Payment:T/T, Western Union

  • Weight: 1000g

  • Shipping port: Xiamen

  • Warranty: 12 months

Configured for high-density discrete signal routing in Experion PKS platforms, the Honeywell MC-TDOY22 (MC-TDOY22 Digital Output Field Termination Assembly) provides direct physical/electrical execution. This hardware assembly interface links the DCS controller I/O processor subsystem to field-mounted digital loads. Operating on a nominal nominal rating of 24 VDC, the assembly provides 32 dedicated output channels designed to drive interposing relays, solenoid valves, and indicator lamps without requiring external signal conversion hardware.

Hardware Specifications

Parameter Specification
Model MC-TDOY22
Brand Honeywell
Origin USA
Weight 1.0 kg
Shipping Weight 4.0 kg
Dimensions Standard FTA Form Factor
Operating Temp 0 to 60 deg C
Power Consumption Nominal 24 VDC system loop supply
Channel Capacity 32 Digital Outputs
Signal Voltage 24 VDC

Channel-to-Channel Isolation and Loop Protocol Stability

The assembly integrates channel-to-channel isolation architecture to prevent ground loops and common-mode transients from propagating back to the main DCS backplane. Each of the 32 discrete channels supports independent field loop wiring, maintaining signal integrity under field-induced electrical noise conditions. Standard galvanically isolated loop paths ensure complete separation between field power distribution and internal processor logic.

Frequently Asked Questions

Q: How is field wiring terminated on the MC-TDOY22 assembly?

A: Field wiring connects directly to terminal block points on the assembly header, which interface to the I/O processor via standardized system interconnect cables.

Q: Can the MC-TDOY22 be installed or replaced while the system is energized?

A: Hot-swapping the assembly requires field power isolation or adherence to class-certified live maintenance procedures to prevent nuisance trips or current spikes across adjacent channels.

Field Installation Guidelines

  1. Mount the assembly on standard DIN-rail or field termination enclosures ensuring physical grounding straps are firmly bolted to the cabinet earth bus bar.
  2. Route 24 VDC field power supply lines separately from high-voltage AC cabling to prevent electromagnetic interference across signal paths.
  3. Verify that all 32 channel connection terminals are torqued to specified limits (typically 0.5 to 0.6 Nm) before applying loop power.
  4. Ensure shield drain wires are grounded at one single termination point at the cabinet entry gland plate to eliminate circulating ground loops.
Order and Warranty Information

Terms of Purchase and Returns

Detailed guidelines on minimum order quantity, delivery times, payment options, warranty, and return policies.

We gladly accept bulk orders, with a minimum order quantity of just one unit.

Upon request, we can provide all necessary documents, including Certificates of Origin/Conformance and other required export paperwork.

We accept 100% T/T (Telegraphic Transfer) payment before shipping. For items with lead times, a 30% deposit is required upfront, with the remaining 70% payable before shipment. For RMB transfers, please contact us if you have an agent in China.

All new and original items come with a standard one-year warranty. For extended warranty options, feel free to contact us for pricing details.

We prioritize your satisfaction. If you need to return an item, it must be done within 30 days of purchase. The product must be unused, unopened, and in its original packaging, including all accessories. Refunds will be processed within 5-7 business days of receiving the return. Please note, shipping and handling charges are non-refundable.

Product comparison