Allen-Bradley 2711E-URAM2 PanelView 1400E Memory Upgrade Kit
Configured for memory upgrade execution in PanelView 1400E automation networks, the Allen-Bradley 2711E-URAM2 (2711E-URAM2 Memory Upgrade System Kit) provides direct physical/electrical execution.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 2711E-URAM2 |
| Brand | Allen-Bradley |
| Origin | United States / Authorized Manufacturing Facilities |
| Weight | 2.00 lbs (0.91 kg) |
| Dimensions | Standard PanelView 1400E internal card slot profile |
| Operating Temp | 0 deg C to 50 deg C (32 deg F to 122 deg F) |
| Power Consumption | Powered via host terminal internal bus |
| Subsystem Type | Memory Upgrade System Kit |
| Target Platform | PanelView 1400E Terminals |
| Module Category | Panel Accessories / Internal Expansion Board |
Industrial Control & Drive Technical Architecture
Designed for deterministic industrial environments, this unit integrates backplane bus communication velocity licences and supports Profinet / EtherNet/IP deterministic networks via its peripheral expansion options. The I/O density scaling and firmware flash compatibility allow seamless integration into legacy Allen-Bradley PanelView 1400E operator interface systems. The upgrade module executes memory expansion routines and processes graphic symbol buffers across internal backplane buses with negligible execution latency.
Frequently Asked Questions (FAQ)
Q: Can the 2711E-URAM2 memory kit be installed or removed while the PanelView terminal is powered?
A: No. Power must be completely removed from the terminal before opening the chassis and installing the memory expansion kit to avoid static discharge and backplane bus corruption.
Q: What precautions should be taken against electrostatic discharge during installation?
A: Installation personnel must wear a grounded wrist strap and handle the memory board strictly by its edges to prevent damage to sensitive CMOS memory components.
Q: Is external power required to operate the memory upgrade module?
A: No external power connections are needed. The module draws its required operating current directly from the internal backplane slot of the host PanelView terminal.
Field Installation Guidelines
- Disconnect all primary AC/DC power sources from the PanelView 1400E terminal before opening the main enclosure housing.
- Observe proper ESD grounding procedures by utilizing an anti-static mat and grounded wrist strap when handling the board.
- Align the edge connector of the 2711E-URAM2 kit with the internal expansion socket on the terminal mainboard and press firmly until fully seated.
- Secure any retaining screws or plastic locking tabs, close the chassis, and restore system power to allow automatic firmware recognition during POST bootup.
Allen-Bradley 2711E-URAM2 PanelView 1400E Memory Upgrade Kit
Allen-Bradley 2711E-URAM2 PanelView 1400E Memory Upgrade Kit
Configured for memory upgrade execution in PanelView 1400E automation networks, the Allen-Bradley 2711E-URAM2 (2711E-URAM2 Memory Upgrade System Kit) provides direct physical/electrical execution.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 2711E-URAM2 |
| Brand | Allen-Bradley |
| Origin | United States / Authorized Manufacturing Facilities |
| Weight | 2.00 lbs (0.91 kg) |
| Dimensions | Standard PanelView 1400E internal card slot profile |
| Operating Temp | 0 deg C to 50 deg C (32 deg F to 122 deg F) |
| Power Consumption | Powered via host terminal internal bus |
| Subsystem Type | Memory Upgrade System Kit |
| Target Platform | PanelView 1400E Terminals |
| Module Category | Panel Accessories / Internal Expansion Board |
Industrial Control & Drive Technical Architecture
Designed for deterministic industrial environments, this unit integrates backplane bus communication velocity licences and supports Profinet / EtherNet/IP deterministic networks via its peripheral expansion options. The I/O density scaling and firmware flash compatibility allow seamless integration into legacy Allen-Bradley PanelView 1400E operator interface systems. The upgrade module executes memory expansion routines and processes graphic symbol buffers across internal backplane buses with negligible execution latency.
Frequently Asked Questions (FAQ)
Q: Can the 2711E-URAM2 memory kit be installed or removed while the PanelView terminal is powered?
A: No. Power must be completely removed from the terminal before opening the chassis and installing the memory expansion kit to avoid static discharge and backplane bus corruption.
Q: What precautions should be taken against electrostatic discharge during installation?
A: Installation personnel must wear a grounded wrist strap and handle the memory board strictly by its edges to prevent damage to sensitive CMOS memory components.
Q: Is external power required to operate the memory upgrade module?
A: No external power connections are needed. The module draws its required operating current directly from the internal backplane slot of the host PanelView terminal.
Field Installation Guidelines
- Disconnect all primary AC/DC power sources from the PanelView 1400E terminal before opening the main enclosure housing.
- Observe proper ESD grounding procedures by utilizing an anti-static mat and grounded wrist strap when handling the board.
- Align the edge connector of the 2711E-URAM2 kit with the internal expansion socket on the terminal mainboard and press firmly until fully seated.
- Secure any retaining screws or plastic locking tabs, close the chassis, and restore system power to allow automatic firmware recognition during POST bootup.
