{"product_id":"allen-bradley-2711e-uram2-panelview-1400e-memory-upgrade-kit","title":"Allen-Bradley 2711E-URAM2  PanelView 1400E Memory Upgrade Kit","description":"\u003cp\u003eConfigured for memory upgrade execution in PanelView 1400E automation networks, the \u003cstrong\u003eAllen-Bradley 2711E-URAM2\u003c\/strong\u003e (\u003cstrong\u003e2711E-URAM2\u003c\/strong\u003e Memory Upgrade System Kit) provides direct physical\/electrical execution.\u003c\/p\u003e\n\u003ch3\u003eHardware Specifications\u003c\/h3\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eParameter\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eSpecification\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eModel\u003c\/td\u003e\n\u003ctd\u003e2711E-URAM2\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eBrand\u003c\/td\u003e\n\u003ctd\u003eAllen-Bradley\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eOrigin\u003c\/td\u003e\n\u003ctd\u003eUnited States \/ Authorized Manufacturing Facilities\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eWeight\u003c\/td\u003e\n\u003ctd\u003e2.00 lbs (0.91 kg)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eDimensions\u003c\/td\u003e\n\u003ctd\u003eStandard PanelView 1400E internal card slot profile\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eOperating Temp\u003c\/td\u003e\n\u003ctd\u003e0 deg C to 50 deg C (32 deg F to 122 deg F)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePower Consumption\u003c\/td\u003e\n\u003ctd\u003ePowered via host terminal internal bus\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSubsystem Type\u003c\/td\u003e\n\u003ctd\u003eMemory Upgrade System Kit\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eTarget Platform\u003c\/td\u003e\n\u003ctd\u003ePanelView 1400E Terminals\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eModule Category\u003c\/td\u003e\n\u003ctd\u003ePanel Accessories \/ Internal Expansion Board\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eIndustrial Control \u0026amp; Drive Technical Architecture\u003c\/h3\u003e\n\u003cp\u003eDesigned for deterministic industrial environments, this unit integrates backplane bus communication velocity licences and supports Profinet \/ EtherNet\/IP deterministic networks via its peripheral expansion options. The I\/O density scaling and firmware flash compatibility allow seamless integration into legacy Allen-Bradley PanelView 1400E operator interface systems. The upgrade module executes memory expansion routines and processes graphic symbol buffers across internal backplane buses with negligible execution latency.\u003c\/p\u003e\n\u003ch3\u003eFrequently Asked Questions (FAQ)\u003c\/h3\u003e\n\u003cp\u003eQ: Can the 2711E-URAM2 memory kit be installed or removed while the PanelView terminal is powered?\u003c\/p\u003e\n\u003cp\u003eA: No. Power must be completely removed from the terminal before opening the chassis and installing the memory expansion kit to avoid static discharge and backplane bus corruption.\u003c\/p\u003e\n\u003cp\u003eQ: What precautions should be taken against electrostatic discharge during installation?\u003c\/p\u003e\n\u003cp\u003eA: Installation personnel must wear a grounded wrist strap and handle the memory board strictly by its edges to prevent damage to sensitive CMOS memory components.\u003c\/p\u003e\n\u003cp\u003eQ: Is external power required to operate the memory upgrade module?\u003c\/p\u003e\n\u003cp\u003eA: No external power connections are needed. The module draws its required operating current directly from the internal backplane slot of the host PanelView terminal.\u003c\/p\u003e\n\u003ch3\u003eField Installation Guidelines\u003c\/h3\u003e\n\u003col\u003e\n\u003cli\u003eDisconnect all primary AC\/DC power sources from the PanelView 1400E terminal before opening the main enclosure housing.\u003c\/li\u003e\n\u003cli\u003eObserve proper ESD grounding procedures by utilizing an anti-static mat and grounded wrist strap when handling the board.\u003c\/li\u003e\n\u003cli\u003eAlign the edge connector of the 2711E-URAM2 kit with the internal expansion socket on the terminal mainboard and press firmly until fully seated.\u003c\/li\u003e\n\u003cli\u003eSecure any retaining screws or plastic locking tabs, close the chassis, and restore system power to allow automatic firmware recognition during POST bootup.\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Allen-Bradley","offers":[{"title":"Default Title","offer_id":52883364643096,"sku":"2711E-URAM2","price":270.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0892\/3483\/3688\/files\/2711E-URAM2_7ad4f263-53d6-47f4-954e-7c106db1e25a.png?v=1791943309","url":"https:\/\/www.innoplcsync.com\/products\/allen-bradley-2711e-uram2-panelview-1400e-memory-upgrade-kit","provider":"InnoPLC Sync Co., Ltd.","version":"1.0","type":"link"}